HERI – Research Actions Database

Welcome to the HERI Research Actions Database. The database provides details of past and present research actions related to all aspects of hydropower. The database has been structured following the categorisation developed for the HYDROPOWER EUROPE research and innovation agenda, and Strategic Industry Roadmap.

The database contents have been collated from a variety of organisations working on research actions across all sectors of the hydropower industry. The information has been share freely and is available as open access. You can search the database or add details of new initiatives to the database via the buttons below.

A brief video introduction to HERI:

 

What, why and how we use data ➧



Environmentally efficient full profile drilling solution

Description

The overall vision of the ECO-DRILLING project is to prototype, pilot, and commercialise our cost-effective and environmentally friendly full profile directional drilling technology for the global hydropower sector. ECO-DRILLING is the only solution capable of drilling upwards over long distances and high heads (up to 2km drilling length-1km altitude difference) using a non-rotatory drill string. Our disruptive technology has the potential to cut annual CO2 emissions with 13,860 tonnes in 5 years according to our sales proyections, reduce the environmental impact of drilling operations (e.g. by eliminating the need for building temporary access roads to the mountain top), and drilling costs by 50%. ECO-DRILLING will support the development of hydropower plants at locations currently unfeasible due to technical or environmental challenges. We have defined a subset of specific objectives covering final prototyping, validation, and commercialisation readiness activities. Achieving them will bring us to a wide market uptake. 1) Technology maturation objectives (WP1) to optimise the functionalities of ECO-DRILLING’s subsystems and integrate them into the final prototype to be piloted in real-life settings, raising ECO-DRILLING TRL from TRL7 to TRL8. 2) Piloting and validation objectives (WP2) to demonstrate ECO-DRILLING’s technical and economic performance, functionality, and user benefits through a large-scale piloting in real-life operating settings, elevating eco-drilling from TRL8 to TRL9. 3) Commercialisation readiness objectives (WP3-6) enabling us to successfully bring the ECO-DRILLING service to the market and reach sales traction beyond Phase 2. Through the ECO-DRILLING SME Phase 2 project we will significantly boost the growth in our company. We estimate that by year 5 after project closure, we will reach accumulated revenues of €138.0m generate at least 37 new full-time positions, and accumulate profits of €61.5m with 6.42 ROI.

Organisations

  • Norhard AS - Coordinator

Funding

  • Private (industry – internal)
  • European funding

Specific Funding Sources:
European Commission

Level of Action:

National: NORWAY

Applications

Large-hydro, Storage Hydropower, Pumped Storage

Keywords

Civil / Structural engineering

Areas of Research

Research and Innovation Agenda

  • Investigation of full profile directional drilling technology

Strategic Industry Roadmap

Last Updated: 22/02/2024 09:44

ECO-DRILLING

Call Number

H2020-SMEINST-2-2016-2017

Project Number

778602

Start Date
2017
End Date
2020

Project website