Solutions to reduce wear in hydropower plants
Description
The objective of WEREHYPO is studying solutions to reduce the wear that takes place in different hydropower plant components as a consequence of the provision of balancing services to the power system. The solutions that will be studied are: - Optimization models for the energy and reserve scheduling considering the cost associated to the wear of different plant components as a function of the operational decisions. - Control algorithms for the coordinated real-time operation of the hydropower plant and an energy storage system, namely, batteries and/or supercapacitors, that minimize the wear of both the hydropower plant components and the energy storage system (often referred to as ageing), while ensuring the provision of quality frequency control.
Organisations
- Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas (CIEMAT) - Coordinator
- Universidad Politécnica de Madrid - Coordinator
Funding
- National funding
Specific Funding Sources:
N/A
Level of Action:
National: SPAIN
Applications
Small-hydro, Large-hydro, Run-of-the-River, Storage Hydropower
Keywords
Digitalization, Economics, Flexibility, Grids, Hydraulics, Maintenance, Modeling / Simulation, Pumps, Turbines
Areas of Research
Research and Innovation Agenda
- Pilot projects integrating hydropower with other RE sources and energy storage systems
- Fatigue-aware optimization models for the hydropower generation scheduling
- Control algorithms to reduce fatigue in the turbine
- Control algorithms to reduce fatigue in the conduits
Strategic Industry Roadmap
- Increase Resilience by Mitigating the Impact of Ageing and Maintaining the High Safety Level of Power Plants
Last Updated: 27/08/2025 16:54
WEREHYPO
Start Date
2025End Date
2028Budget Range
€100,000 - €500,000